MAIN
TERMINAL
A brand-new quay delivered in 2016 measures 410 meters with a draft of 11.5 meters
50 hectares of storage with an annual capacity of 375,000 TEU
15,805 square meters
350 Reefer Plugs with 24 hours monitoring
A well-equipped technical center lies on 25,000 square meters
A state-of-the art TOS provides us with an optimized container terminal environment with real-time information allowing us to be efficient and timely in delivering the best service to our customers every time.
25,000 square meters of storage
EXPLORE OUR EQUIPMENT FLEET
CPS, keen to provide reliable and efficient services, has invested heavily in equipment since launching operations in 2016.
3 model 6 Gottwald Mobile Harbor Crane
Allocated to loading and unloading vessel operation activities.
24 Capacity Mules & Trucks
Mainly allocated to transfer from quay to storage area activities.
25 Container Handling Equipment
To transport containers.
48 Bomb Carts
OFF DOCK
PERSONAL EFFECT TERMINAL
An “Off dock” terminal of 38,600 m2 with a capacity of 3700 TEUs was built in Drouillard in July 2020 to relocate personal effects activities
WAREHOUSING
& LOGISTICS
CPS launched a 25,000-pc unbundling service in October 2020